FOR PEER Assessment Energies Energies 2021, REVIEW8 of 19 8 of 19 eight of8 o 8 okW
FOR PEER Critique Energies Energies 2021, REVIEW8 of 19 eight of 19 8 of8 o 8 okW kW CHP (electrical energy) CHP (electrical power) CHP (electrical power) CHP (electrical energy) kW CHP (electrical energy) kW 33 kW 33 kW CHP(electricalpower) (thermalkW (electricalpower) CHP (thermalkW (electricalpower) CHP (thermalkW 33 kW CHP (electrical power) boiler Unit boiler CHP (electrical power) CHP CHP power) Property 1284 boiler 284 CHP 33 power) kW energy) kW Back-up boiler Back-up Back-up PF-06873600 MedChemExpress kWBack-up boiler EV Heat kWBack-up kW kW Parameter/System Element CHP (thermal power) CHP(electricalpower) (thermalkW (electricalpower) CHP (thermalkW 73 kW CHP CHP power) CHP 284 power) power) kW Back-up boiler water tank(electrical l Hot water kWBack-up boiler5000 Back-up boiler water kWBack-up boiler5000 Back-up boiler kW 284 kW Hot water tank Hot Hot tank tank 13 l Hot water tank l l Number of dwellings CHP (electrical energy) boiler(electrical power) boiler 33 CHP CHP (electrical power) kWBack-up kW kW Back-up tank water tank5000 Back-up boiler water tank5000 kW Hot water tank water tank water lBattery (DNQX disodium salt manufacturer capacity)67 (capacity)67 Hot (capacity) (capacity) Hot Hot lBattery Hot l l Battery (capacity) Battery boiler Battery2 kWh kWh kWh Back-up Back-up boiler 1471 boiler 284 kWBack-up kWh kW Living area Hotm tank Hot tank Hot tank l l Battery (capacity) (capacity) water kW Battery (energy) Battery (capacity) water kW 67 (capacity)67 kWh Battery (capacity)50 (energy) 50 kWh water kW Battery kWh kWh Battery (power) Battery Battery (power) Battery (energy) Battery kW Hot water tank Hot tank water tank5000 lBattery Hot l Hot water demand Battery (energy)kWh/a kW Battery (capacity) water kW 528,000(energy) 50 Battery (capacity)50 (capacity) kWh kWh Battery (energy) of Number of (energy) of (energy) 92of Battery Quantity Battery Quantity Battery kW 92 kW Number of parking lots parking lots parking lots parking lots parking lots Number Battery (energy) kWh Battery kWh Battery (energy) Battery parking 92 Battery kW 67 kW Electricity demand Battery (capacity) of parking lots (capacity) of(capacity) Quantity charging points Quantity charging points Number charging lots parking ofof parkingpoints Quantity charging 54,000 (energy) 92 Quantity charging kWh/a Quantity ofof Quantity lots Quantity lots Number ofof Number lots parkingpoints of points 30 of 30 Battery (power) of parking lots parking lots parking lots Battery (power) of (power) 50 kW Battery Number charging points Quantity charging points kW Quantity of Quantity 30 Quantity of charging points Number of charging points Number of Number of charging points of 30 Grid connection kW 62 Quantity of Quantity lots Quantity ofof Quantity lots parkingpoints parking of charging points Quantity of Quantity charging points parking of charging lots 92 For our study,technique study, we simulated several method simulated (see Table two)be scenarios For our For our study, we scenarioswe scenarioswe simulated (see would For our study, numerous system scenarios several sys For our study, that would that PV we simulated many system simulated (see Table two) various program Table 2 kW 20 Number many program simulated (see Quantity (see Table two)be scenarios of simulatedpointsstudy, we simulatedpointswould pointswould charging we scenarios many program simulated (see Table 2 Quantity of charging we charging 30 of scenarios many sys For our possible in simulated our possible numerous program the thought of draw generaldraw g study, we the thought of building in the regarded creating that build.

By mPEGS 1